The Good Side of 311 · Part 2 of 6

Four 311 Codes That Close ~10x Faster Than the City Promises

Street lights, hydrants, street trees and general Streets complaints. Each one closes in days against a published window of weeks or months.

Four of the top-30 codes close 7.7× to 11.4× faster than the city’s published SLA

Philadelphia 311 publishes a 90-business-day window for street light outages. That is four months between report and fix. As a citizen, a 90-business-day window is the kind of number that tells you to just live with the dark block.

The median close time on that code, across 2,800 tickets in the last two and a half years, is 7.9 days.

I started pulling the data expecting a long list of failures, the way my earlier series on 311 did. What I found instead was a different pattern. On four of the 30 service codes Philadelphians actually call 311 about, the median close time runs in days while the city’s published promise runs in weeks or months. Those four are the four biggest over-deliverers of the eight that clear a 2× bar. The chart above is those four.

Eight of the top thirty codes close at least twice as fast as the city promised

Every 311 service code comes with a published service-level agreement: a number of days, usually business days, that the city says it will take to close a typical ticket. Divide the median close time on a code by that published window and you get a promise_ratio. A ratio of 1.0 means the typical ticket closes when the city said it would. A ratio of 0.5 means it closes in half the promised window. The chart plots the inverse, times faster than promised.

Eight of the 30 codes come in at 0.5 or below. The four on the chart have the four smallest ratios of the eight, though the gap between fourth place (7.7×) and fifth (6.3×) is narrow.

The four biggest over-deliverers are work a department does every week

Each of these is a workaday 311 service, the kind of ticket a Streets crew, a Water Department crew or a Parks and Rec crew handles as part of a normal week. None of them is a special case.

  • Street Light Outage: Streets Department, 90 business days promised, median close 7.9 days, 11.4× faster than promised. 2,800 closed tickets in the window. Met rate 86.0%.
  • Hydrant Request: Water Department, 30 business days promised, median close 3.1 days, 9.6× faster than promised. 1,183 tickets. Met rate 92.7%.
  • Street Trees: Parks and Recreation, 15 business days promised, median close 1.8 days, 8.2× faster than promised. 10,710 tickets. Met rate 71.7%.
  • Complaint (Streets): Streets Department, 30 business days promised, median close 3.9 days, 7.7× faster than promised. 2,256 tickets. Met rate 88.0%.

Together, the four cover 16,949 tickets: 4.7% of the closed tickets in the top-30 cohort, and 3.5% of the closed-with-SLA universe as a whole.

Each of the four is a tight loop, and each is the kind of work the department was built to do

Hydrant Request is the cleanest case. A hydrant is either flowing or it is not. The diagnosis is mechanical, the fix is a truck and a wrench, and the crews close these the same week they get them. The 30-business-day SLA is an institutional shrug; the operation runs on its own clock.

Street Light Outage looks the same on the ground. A crew drives the route, swaps the bulb, closes the ticket. The 90-business-day window is indefensible as a commitment to a citizen. But the median close is 7.9 days, because the operation is fine and the published promise is what is out of date.

Street Trees is the largest by volume, 10,710 tickets and a median close of 1.8 days. Pruning or removing a tree is not light work. The 15-business-day SLA is generous, not aspirational.

Complaint (Streets) is the closest to a catch-all: anything a citizen files against the Streets Department that does not fit a more specific code lands here. Published window 30 business days, median close 3.9 days, met rate 88.0%. It is the fourth-widest gap between promise and performance.

Each one is a tight loop: a small number of crews doing the same kind of work every week, with a short distance between the citizen’s report and the fix. Each one is also core to what the department was built to do. In every case the published window is doing less work than the operation behind it.

The city’s own table lists street lights twice, and the second row is worse

There is a catch, and it sits in the same table. Street light outages appear on it twice. The 90-business-day row is the one the chart above uses: 2,800 tickets, a 7.9-day median, met 86.0% of the time.

The second row is a 10-business-day window covering 16,433 tickets. That is more street light work than the 90-day row’s 2,800, and more than the other three codes on the chart combined. On that row the median close is 14.1 days, which is 41% slower than promised, and it ranks 21st of the 30 codes. The data does not say why the city publishes two windows for the same service, and the ticket counts do not settle it. The 11.4× figure depends on which window you compare against, and 16,433 street light tickets are not the city beating its promise.

These four are 4.7% of the tickets. Eight of thirty codes beat their promises at all.

The volume question first. 16,949 tickets is a real slice of the city’s 311 work, and it is made of routine tickets rather than exotic ones. Street Paving, for comparison, is 1,860 tickets in the same cohort.

The proportion question is the harder one. Eight of the thirty codes clear the 2× bar, and these four have the smallest ratios of the eight. The other four that clear it are Parks and Rec Safety and Maintenance, Street Paving, Traffic (Other) and Line Striping. Then there are the codes going the other way: Shoveling, with a 1-business-day promise, met 11.6% of the time; Abandoned Vehicle at 120 business days, met 44.1%; Smoke Detector at 60 business days, met 36.8%. Some of the city’s 311 promises are generous and some are not, and the gap between the two is what the rest of this series is about.

Eight codes out of thirty over-deliver by at least 2×, and these four beat their published windows by the widest margin. That is more than I expected when I started. It is also a smaller claim than it looks, because how far ahead the city runs depends on how loose the promise is. On the city’s tighter street light window, the same service misses by 41%. What a Philadelphian actually experiences is the median close time, not the published window, and on these four codes that is a few days.


Notes, Sources, and Methodology

All data is the OpenDataPhilly 311 Service Requests table public_cases_fc: 490,366 closed-with-SLA tickets filed 2024-01-01 through mid-2026. The 30 codes analyzed here are the biggest by ticket count, 361,914 tickets, or 73.8% of the universe.

Methodology. The city publishes its windows in business days and the close times are calendar days, so every ratio here divides calendar days by business days. That makes the chart conservative. The 90-business-day street light window is 126 calendar days, which would put that code at 16× rather than 11.4×.

One thing this article is not measuring. The headline is the median close time. A code can have a fast median and a brutal tail, and Street Trees has both: 1.8 days at the median, 256 days at the 90th percentile, so for the slowest tenth of its tickets the wait is eight months or more.